4M change management
people (Man), machines (Machine), materials (Material), and methods (Method)

4M change management refers to the process of managing changes in the four key elements of people (Man), machines (Machine), materials (Material), and methods (Method) during the production process. These four elements are important factors that affect product quality and the stability of the production process.Changes in any one of these elements may have an impact on product quality, production efficiency, etc.

The following is a detailed analysis of 4M change management:

1. Elements of 4M change management 1. Personnel (Man): refers to the operators in the production process. Personnel changes may include the addition of new employees, employee transfers, resignations, or retirements. Effective personnel change management requires strict training and competency assessments for new employees to ensure that they are competent for the job; at the same time, for employees who leave, a knowledge inheritance mechanism should be established to retain their experience and skills.

2. Machine: refers to equipment, tooling, molds, etc. in the production process. Machine changes may involve equipment upgrades, maintenance, or technical transformation. When making machine changes, it is necessary to consider the compatibility of the new equipment with the existing production system, develop a maintenance plan to reduce the impact of equipment failures on production, and conduct risk assessments to ensure that the changes will not have a negative impact on product quality.

3. Material: refers to the raw materials used in the production process. Material changes may include the replacement of raw materials, the introduction of new suppliers, or adjustments to inventory management. In material change management, it is necessary to ensure that new materials meet product quality standards and maintain good communication with suppliers to ensure the stability of material supply.

4. Method: refers to the processing method used in the production process. Method changes involve changes in production processes, processes, or operating methods. When changing methods, it is necessary to test the new process to ensure that it can improve production efficiency, train employees on the new process to ensure that they can operate it proficiently, and encourage employees to participate in the change process to improve production efficiency and product quality through continuous improvement.

  The process of 4M change management

1. Change identification: Identify the 4M elements that need to be changed and record the reasons and goals for the change.

2. Risk assessment: Assess the risks that may be caused by the change and formulate corresponding preventive measures.

3. Change plan: Develop a detailed change plan, including a timetable, resource allocation, and responsibility allocation.

4. Communication and coordination: Communicate with relevant personnel to ensure that the change plan is understood and supported.

5. Implement changes: Implement changes as planned and monitor any problems during the change process.

6. Verification and archiving: Verify the effect of the change, record the verification results, and organize and archive all documents and records during the change process. 


The significance of 4M change management

1. Ensure product quality: Ensure that product quality is not affected by strict inspection and verification of new materials, equipment, processes or personnel.

2. Maintain production stability: Plan and control changes in advance to restore the production process to stability as soon as possible and reduce interference with production plans.

3. Compliance requirements: Meet the regulatory agency's control requirements for the production process to ensure product quality and production safety.

4. Continuous improvement: Encourage employees to participate in the change process and improve production efficiency and product quality through continuous improvement. IV. Practical application of 4M change management In actual applications, enterprises can flexibly define the 4M change management process according to their own needs and process characteristics.

For example, you can access the workflow engine, customize the change application form and approval process; electronically store all change records, support conditional query and export; set the approval time and responsible person transfer function, etc. These measures help enterprises implement 4M change management more effectively and improve production efficiency and product quality. In summary, 4M change management is an important means to ensure production stability and continuous improvement. Through effective change management, enterprises can reduce production interruptions, improve production efficiency, ensure product quality, and ultimately achieve cost control and enhance competitiveness.








4M  people (Man), machines (Machine), materials (Material), and methods (Method)

How to do Inspection for EU Kitchenware by EN 12983
EU Kitchenware Standard EN 12983 Updated.