An inspection day, step by step
Clients often ask: what exactly happens during an inspection? The short answer is that our Consumer Goods Inspection Procedure turns every factory visit into a repeatable, evidence-based process. Here is how it works.
1. Preparation
Before departure, the inspector downloads and studies the order details and technical documents, confirms the inspection requirements, and contacts the factory to confirm the goods are ready. Tools are checked — including our own defect labels, tape, hygrometer, batteries and measuring equipment.
2. Check-in and opening meeting
The inspector arrives on time, checks in through our app with location verification, and holds an opening meeting with the factory: the integrity statement is read and signed, and the client's requirements, sample quantity and factory support are clearly explained.
3. Counting, sampling and photography
Cartons are counted against the order and packing list, the warehouse is photographed, and cartons are sampled randomly (square-root rule, MIL-STD-105E / ISO 2859-1 AQL sampling). Products are drawn under supervision and never leave the inspector's sight. The photo sequence runs from warehouse panorama to carton markings, packaging, product details and on-site testing.
4. Inspection and testing
Appearance is checked at arm's length under good lighting; functions are tested on all samples; defects are tagged and classified as Critical, Major or Minor. On-site tests follow the technical protocol supplied by our supervisors.
5. Closing and reporting
Results are communicated to the factory clearly and fairly, the draft report is signed, and the final report — with photos and evidence — is submitted the same day for review.
The full procedure, with all details on sampling, sealing and reporting, is available in our policy library in preview mode.
Preview our quality policies (EN / 中文) →
QCANT — Independent quality inspection & auditing in China. Contact us: cs@QCANT.com.